A technician standing in front of a broken asset with the right skills but no spare parts is a costly failure. eWorks Online ensures the right part is in the right storeroom at the right time — without overstocking, without emergency procurement, and without guesswork.
Start Free TrialThe Parts Problem
MRO (Maintenance, Repair, and Operations) inventory is the supply chain of facility maintenance. Filters, belts, bearings, lamps, fuses, contactors, plumbing fittings, cleaning chemicals, safety equipment — hundreds of line items spread across storerooms, tool cribs, and van stocks that must be available when a work order demands them.
Too much stock ties up capital and risks obsolescence. Too little means emergency purchases at premium prices and extended downtime while parts are sourced. eWorks Online strikes the balance with data-driven inventory management that connects consumption patterns directly to work order activity and PM schedules.
Every part drawn from the storeroom is linked to a work order, costed against an asset, and debited from stock in real time. When levels drop below the minimum threshold, the system generates a purchase requisition — or, if configured, triggers an automatic order to your approved supplier.
Inventory Features
Operational Impact
Consider a typical scenario: a chilled water pump fails in a commercial building. The technician diagnoses a failed mechanical seal. Without inventory control, the next steps are unpredictable — is the seal in stock? Which storeroom? What is the part number? Who is the supplier? What is the lead time?
With eWorks Online, the technician checks stock on their mobile device, finds two seals available in Storeroom B, reserves one against the work order, walks over, scans the barcode on issue, and fits the part. The stock level updates instantly, the cost is attributed to the pump's maintenance record, and when the last seal is drawn, a purchase requisition is automatically generated to the approved supplier.
The pump is back online within an hour instead of waiting three days for emergency procurement. Multiply this across hundreds of assets and thousands of work orders per year, and the impact on uptime, cost, and operational efficiency is substantial.
For organisations managing inventory across multiple sites — a hotel chain, a portfolio of commercial buildings, or a condominium with several blocks — centralised inventory visibility prevents the common problem of one site overstocking while another runs out of the same part.
Explore More
eWorks Online MRO Inventory Control eliminates stockouts, reduces carrying costs, and ensures every repair moves forward without delay.